AUSENCO-MARTABE PROJECT MORE PACKAGES TO LINTECH

Customer : PT. Agincourt Resources, Year : 2011.
After experienced work as a team within last 6 months and feeling comfort with Lintech capabilities to deliver quality products for the previous major plant packages, Ausenco-PT. Agincourt Resources again placed more package for Martabe Project called:
Tanks, Launders & Structural Steel – WWPP
This repeating order is casting the future relationship with Ausenco. Lintech will be Glad to participate in future Ausenco Projects.
This is also proof Lintech as a capable company to deliver steel fabrication and construction works for strategic and major capital Mining infrastructure investment projects.
 
     
     
     
 
 
Client : Ausenco - PT. Agincourt Resources (Martabe Project)
Completion Date : TARGET December 2011
General Scope of Work : Various Carbon and stainless steel plate (mechanical) and structure works, shop detail drawing, fabrication, blasting, painting, packing, shipping door to door (Lintech seaside facility-project site).

1). P.O No. : 1929-0100
Steel structure fabricated, consist of :
Pipe rack area       = 284.20 tons
Crusher area          = 208.69 tons
Grinding area         = 370.40 tons
Leach area             = 542.79 tons
Desorption area     = 169.44 tons
Carbon Reagent     = 139.07 tons
Gold Room              = 123.19 tons
Detox area              =    73.31 tons
Reagent area          =    40.70 tons
Air Service              =       3.94 tons
Raw water Service =      8.90 ton +
Grand total steel's tonages = 1964.63 Tons

2), P.O No. : 1929-0110
9 units Stenlees Tank, SS-316     = 114.15 Tons
12 units Carbon steel Tank, A-36 = 211.80 Tons + Steel structure for tanks = 124.49 tons
Grand total steel's tonages = 450.44 Tons

3), P.O No. : 1929-0101B
Beberapa Chute & Hopper (Plate & Mechanical work + Rubber lining) = 38 units
Area total rubber lining = 5,432,912 cm3 atau 54,329.12 m3

Grand total steel's tonages = 136.90 Tons

4). P.O No. : 1929-0108A
Steel structure utk Conveyor :
CV-001 Area = 129.5 Tons
CV-002 Area =   45.2 Tons
CV-003 Area =   33.1 Tons
CV-004 Area =   40.5 Tons
CV-005 Area =     5.8 Tons
Grand total tonages = 254.12 Tons

Source : Lintech Duta Pratama